2024 BMW M3 COMPETITION XDRIVE

$92,900

3.0L Twin Turbo I6 Gasoline Engine

AWD w/ RWD Drive Mode Selection, 8 Speed Steptronic Automatic Transmission

Four Door Sedan with M Sport Seats, Carbon Roof, Carbon Trim Package, Power Tailgate

20" BC Forged Wheels with Michelin Pilot Sport Cup 2 Tires

Sport Exhaust System, Dynamic Cruise Control, Adaptive M Suspension, Adaptive Headlights

Blind Spot Detection with Front & Rear Park Assist, 360 Degree Camera

Curved Touchscreen Display with Bluetooth, Sattelite Radio, Apple Carpay & Android Auto

Heated & Cooled Seats

  • AM/FM Stereo
  • Active Belts
  • Air Bags
  • Air Conditioning
  • Aluminum Wheels
  • Android Auto
  • Anti-lock Brakes
  • Apple CarPlay
  • Automatic High Beam
  • Backup Camera
  • Backup Sensors
  • Blind Spot Indicator
  • Blind Spot Warning
  • Bluetooth, Hands Free
  • Bucket Seats
  • Cell or Intergrated Cell Phone
  • Center Console
  • Cooled Seats
  • Crash Imminent Braking (CIB)
  • Cross Traffic Alert
  • Cruise Control
  • Daytime Running Lights
  • Dual Rear Side Air Bags
  • Dynamic Brake Support (DBS)
  • Electronic Stability Control (ESC)
  • Fog Lights
  • Forward Camera
  • Forward Collision Alert
  • Heated Mirrors
  • Heated Seats
  • Immobilizer / keyless entry / and alarm
  • Keyless Entry
  • Keyless Ignition
  • Leather Seats
  • Multi-zone Climate Control
  • Navigation System
  • Parking Assist
  • Power Brakes
  • Power Driver's Seat
  • Power Lift Gate
  • Power Locks
  • Power Seats
  • Power Steering
  • Power Windows
  • Premium Audio
  • Premium Wheels
  • Rear Air Bags
  • Rear Air Conditioning
  • Rear Cross Traffic Alert
  • Rear Defroster
  • Rear Head Air Bags
  • Rear Heat
  • Rear Pre-Collision Braking
  • Satellite Radio
  • Security System
  • Semiautomatic Headlamp Beam Switching
  • Side Air Bags
  • Signal Mirrors
  • Spoiler
  • Steering Wheel Controls
  • Tilt Steering Wheel
  • Tinted Windows
  • Tire Pressure Monitoring System
  • Traction Control
  • Trip/Mileage Computer
  • Turbo
  • Turbocharger

$92,900

Mileage:
9,592 Miles
Type:
Car
Body style:
sedan
Exterior:
alpine white
Interior:
kyalami orange
Engine:
Gas 3.0L 6 cylinder
Transmission:
8 speed automatic
Drive Type:
All Wheel Drive
Stock:
FR59007
VIN:
WBS43AY0XRFR59007
SHOW ME THE CARFAX

Check Availability